Variant to the Urban Development Plan

•The hamlet, dating back to the 1950s, was originally a temporary mountain pasture and is composed of 20 rural stone buildings (total building area 1,700 sqm + 9.5 hectares of owned land/woods)

•The hamlet is accessible by an asphalt road located about 180 meters far from the center of the settlement

•The project is approved by the Municipality through a Services Conference and the current Urban Development Plan authorizes this transformation through an Urban Variant approved in 2020

•According to the approved Urban Variant, the capacity of the new building complex is equal to 4,130 sqm of gross usable floor area and 15,000 cubic meters of volume that can be built