Why invest in our project
SIMPLE PROCESS
Advanced project approval status (urban, landscape, environmental, health and hydrogeological compatibility) and simplified permitting process that reduces planning risks. Technical clearances have been acquired through a Services Conference and a specific Variant to the Urban Development Plan has been drafted.


READINESS FOR CONSTRUCTION
The building site can be started in the short term and all the areas affected by the intervention are owned. For the start of works, it is possible to proceed directly with Building Permit, after signing an Agreement with the Municipality of Ostana. The results of the geological analyses necessary for the design of the concrete structures (dynamic penetrometric geotechnical investigation) have already been acquired.
UNIQUE DESIGN
Prestigious architectural signature by Arch. Prof. Antonio De Rossi, full professor at Polytechnic of Turin and one of the main expert in mountain architecture with projects successfully completed in the Alpine region. Also a highly qualified team of architects/engineers collaborated on the project, with specialization in mountain construction, sustainable design, reuse and valorization of local resources, innovative energy systems.


EXCLUSIVE LOCATION
Exclusive location in a prestigious mountain area, far from mass tourist circuits. The isolation of the hamlet allows guests to fully enjoy the high mountain life and landscape
experience. The comfort of the structure is expressed through the quality of spaces, the highlevel performance of its services, the hospitality, which stage the greatest values of the place. Advantage of the “first mover” in the luxury segment in the area.
LOCAL CULTURE PROMOTION
Authenticity, exclusivity, sustainability and promotion of local culture, history and territory, in line with the current market trend in the tourism sector. The project aims to recover as many existing buildings as possible, maintaining the character of the open spaces and natural elements of the site, inserting the new required buildings respecting the
harmony of the place, and carefully planning the new exterior structures.
